Hard Rocks Mining
Home
Contact Us
Company Profile
About Us
Project's
Challenge's
Strategy
Asset integrity
Hard Rocks Mining
Home
Contact Us
Company Profile
About Us
Project's
Challenge's
Strategy
Asset integrity
More
  • Home
  • Contact Us
  • Company Profile
  • About Us
  • Project's
  • Challenge's
  • Strategy
  • Asset integrity
  • Home
  • Contact Us
  • Company Profile
  • About Us
  • Project's
  • Challenge's
  • Strategy
  • Asset integrity

Project - Jarda Site

Challenge's

Upon HARD ROCK takeover and acquisition of the Mine, the management immediately initiated the rehabilitation of the mine; this rehab period took 2 years. 


During rehab pits were found to be flooded and drowned, with the main pit collapsed due to previous poor planning and design of the quarry. 


Main pit was flooded twice - size 290 x 310 x 80meters depth = 5 million Cubic meter of water required pumping.


Dewatering – Purchased the Correct type of Pumps in terms of size and capacity to pump and dewater the drowned pits.


Built Protection Dams upstream to divert rainwater floods from the pit.


Constructed Water Channels for diverting the rainwater

  • Contact Us
  • Company Profile
  • About Us
  • Project's
  • Challenge's
  • Strategy
  • Asset integrity

Hard Rocks Mining

Copyright © 2026 Hard Rocks Mining - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept